Milestones:  
2015: Schedule: December | Mission complete 
Mission: High-altitude balloon experiment. 
Objectives: Radiation test on electronic components and altitude “hack” of generic GPS firmware. 
Funding: Hardware already funded and paid for. 
Mission was carried out successfully by two teams in the U.S. Valuable scientific discovereis were made about the radiation-levels at high altitudes. The electronic worked without any failures, exposed for more than 100x normal radiation, and freezing -60C. 

2016: Schedule: May | Mission complete 
Mission: High-altitude balloon experiment. 
Objectives: Radiation test on electronic components.
COM/NAV/CTRL-telemetry check from 35 000 m
Funding: Hardware already funded and paid for. 
Clear skies:
300 baud at GPRS at 35 000
2 Mbit/s direct antenna at 1.3 GHz
11 Mbits/s direct parabolic antenna with gain at 2.4 GHz

2016: Schedule: July | Mission complete 
Mission: High-altitude balloon experiment. 
Objectives: Radiation test on electronic components - COM/NAV/CTRL-telemetry check from 35 000 m
Funding: Hardware already funded and paid for. 
Thunderstorm:
No GSM connection at 35 GHz.
Distorted signal direct antenna at 1.3 GHz
0.1 Mbits/s direct parabolic antenna with gain at 2.4 GHz with several cuts in communication.

2017: Schedule: Mars | Mission complete 
Mission: High-altitude balloon experiment. 
Objectives: COM/NAV/CTRL-telemetry check from 35 000 m
Funding: Hardware already funded and paid for. 
Partly cloudly:
300 baud at GPRS at 35 000 distance to closest GSM-ground station 30+ km.
5 Mbit/s direct antenna at 1.3 GHz
16 Mbits/s direct parabolic antenna with gain at 2.4 GHz
1 Mbit/s 440 MHz secondary telemetry link


2018: Schedule: July | (Mission postponed to 2019, temporary due to abnormal atmospheric disturbance in the Stratosphere.)
Mission: Phaeton 4 mission to the Stratosphere.. 
Objectives: Radiation test on electronic components for ROSS 1
Funding: Hardware already funded and paid for.
Funding for for some parts remains.

2019: 

Schedule: July (Postponed to 2022 because of the delayed Radiation Test and Diagnostic mission) 
Mission: ROSS 1 (H.O.P.E 7) rocket launch. 
Objectives: Component sustainability-test for withstanding the force of 7 G's and radiation in space.
Funding:  Not funded yet. Funding needed for propellant and hardware (Engine). 
To build the bigger Phaeton-space ship, ROSS 1 needs to pass a series of testes.
ROSS-1 (HOPE7) is one of the two carries boosters on the Phaeton space ship but can also be used to launch smaller payloads to low altitude. (300-350 km)

Schedule: July
Mission: BULLDOG 1 rocket launch. (H.O.P.E 8) (CANCELED - Project Bulldog is replaced by the Phaeton Project)
Objectives: Reaching LEO (Low Earth Orbit - 400 km) and deploying payloads. (Fuel depots for future missions to the moon) 
Funding: Funds needed for hardware. 


Schedule: December
Mission: BULLDOG 2 rocket launch. (H.O.P.E 8.2) (CANCELED - Project Bulldog is replaced by the Phaeton Project)  
Objectives: Experimenting with magnetic traps for anti-matter in higher Earth orbit. (500 km altitude)   
altitude
Funding: Not funded yet. 
Schedule:

Schedule:November
Mission: BULLDOG 3 rocket launch. (H.O.P.E 9)  Objectives: Researching the possibility of bringing back anti-matter to Earth using magnetic traps for researching in alternative clean energy and refueling depots for future missions to the moon.   
Funding: Not funded yet. (CANCELED - Project Bulldog is replaced by the Phaeton Project)
 
2020:
Mission: Planning, designing and building the infrastructure for the Phaeton-project.
This is an all year event.

2022: 
Schedule: Mars/April 
Mission: Phaeton S1 mission to the LEO (Low Earth Orbit) at 400 km altitude. (S1-series are smaller rockets)
Objectives: Start building Bitnation Space Station 1 (BSS-1)
Funding: Not funded yet. 
Schedule: September

Mission: Phaeton S2 mission to BSS-1 (Bitnation Space Station 1)
Objectives: Building a space-station, functioning as a factory for building the final version of the Phaeton Space Vehicle in zero-gravity.
Secondary Objectives: Testing drones and robots in orbit, for optimal configuration that can later be applied to the rest of the system.
Funding: Not funded yet. 

Schedule: December
Mission: Phaeton S3
Objectives: Building a space-station, functioning as a factory for building the final version of the Phaeton Space Vehicle in zero-gravity.
Funding: Not funded yet.   

2023:

Schedule: April/May 
Mission: Phaeton S4 rocket launch. (H.O.P.E 10) 
Objectives: Putting new fuel depots in orbit for Phaeton 7 mission to reach the Moon. 
Funding: Not funded yet. 

Schedule: August/September 
Mission: Phaeton S5 rocket launch. (H.O.P.E 11) 
Objectives: Putting fuel depots and radio-relay satellite in orbit for Phaeton 7 mission. 
Funding: Not funded yet. 

2024:

Schedule: November 
Mission: Phaeton S6 mission to BSS-1
Objectives: Sending probe into the antimatter-ring around the planet.
Secondary Objectives: Capturing, Containing and Moving Antimatter
Funding: Not funded yet. 

2025: 

Schedule: January 
Mission: Phaeton S7 rocket launch. (H.O.P.E 12) 
Objectives: Putting communication satellites in geostationary orbit for radio-relay from the Moon to Earth. 
Funding: Not funded yet. 

Schedule: Mars/April
Mission: Phaeton S8 rocket launch. (H.O.P.E 13) 
Objectives: Putting fuel depots and radio-relay satellite in orbit for Phaeton 7 lunar mission.
Funding: Not funded yet. Schedule: September/October 

Mission: Phaeton S9 mission to the BSS-1 
Objectives: More fuel for the Phaeton space craft. 
Funding: Not funded yet. 

2026: 

Schedule: April/May 
Mission: Phaeton 6 rocket launch to BSS-1. (Large rocket)
Objectives: Deploying lunar mission cargo.
Funding: Not funded yet. 

Schedule: September 
Mission: Phaeton S6 rocket launch. (H.O.P.E 14) 
Objectives: Deploying cargo to the space station. 
Funding: Not funded yet. 

Schedule: December 
Mission: Phaeton 7 manned mission to the space station BSS-1, by entering the atmosphere and lift-off back into orbit carrying astronauts for further travel to the Moon.
Objectives: The first human space flight by the Bitnation Space Agency to the space station in orbit. 
Funding: Not funded yet.

The schedules for the objectives are estimated based on current technology and funding.